Originally Posted by
win
The plan is to take down the two MTN ops buildings downhill of the mushroom. There is a water plant that would remain but the rest of the area would maintain a retaining wall near where the existing foundation is and the area filled in with dirt and seeded. Loading would be approximately the middle of the mountain operations building. It would be spaced so as not to interfere with Bravo corral and the ski passage way from Gondolier past Bravo. it would provide great uphill out of the area.